 Construction update in photos below. For more information and/or to subscribe to the CLC Newsletter, visit:  http://www.campuslifecenter.com/. Photos provided by Emory Campus Services.

CLC Construction- September 2019- update_internal-open-side_view
Above, the terra cotta colored trim has been applied to the framing of the trellis on the south pavilion.

CLC construction September update- stair step side front view
Above, the crew is finishing framing for the grand staircase.

CLC Construction September 2018-update-front-side-view
Above, on the plaza between the CLC and the AMUC, near the center of the photo, stone facing material has been attached to the block wall. The blue insulation in the foreground is used to thermally insulate the building below. The plywood panels scattered along the plaza are used as temporary ballast to keep the insulation in place. The large white PVC pipe is part of a two-stage drainage system for the plaza.